
1z0-1075-24 PDF Dumps Real 2025 Recently Updated Questions
Released Oracle 1z0-1075-24 Updated Questions PDF
NEW QUESTION # 24
Which statement is NOT true about using a Quick Complete action for an operation transaction?
- A. You can use It to transact one or more serial numbers.
- B. It is used on serial tracked operations and non-serial tracked operations with or without inspections.
- C. You can use it for simultaneous reporting of one or more transactions.
- D. You can use it to transact only one serial number at a time.
- E. You can use it to collect Inspection results.
Answer: D
Explanation:
The Quick Complete action allows for fast, simplified transaction processing for work orders and operations. The statement that is not true is:
Statement E is incorrect because Quick Complete can be used to transact multiple serial numbers at a time, not just one. This feature is designed to handle both serial-tracked and non-serial-tracked operations efficiently.
Correct statements:
Statement A: Quick Complete supports simultaneous reporting of multiple transactions, allowing for streamlined processing.
Statement B: It can be used for both serial-tracked and non-serial-tracked operations, whether or not inspections are involved.
Statement C: Multiple serial numbers can be transacted at once using this feature.
Statement D: While Quick Complete can handle inspection-related transactions, it is not specifically for collecting inspection results.
NEW QUESTION # 25
Which three statements are true about executing rework work orders with manual control?
- A. You cannot cancel the work order after releasing it or after performing any transactions.
- B. If the group has grouping attributes, only work orders that match the grouping attribute values can be assigned to the groups.
- C. You must manually issue the assembly item to rework a work order, either partial or full quantity.
- D. You can cancel the work order after releasing it and after performing any transactions.
- E. You can perform operation completion only after the assembly has been issued to the work order, and only up to the quantity that the assembly component item Is issued to the work order.
Answer: A,C,E
Explanation:
In Oracle Manufacturing Cloud, executing rework work orders with manual control requires certain steps and restrictions to ensure proper tracking of rework activities:
Statement A: You can perform operation completion only after the assembly item has been issued to the work order. The quantity that can be completed is limited to the quantity of the assembly issued.
Statement C: The assembly item must be manually issued to the work order, allowing for flexibility to issue either a partial or full quantity depending on the rework requirements.
Statement D: Once a work order is released and transactions have been performed, it cannot be canceled. This ensures that work orders already in progress are tracked properly.
Incorrect options:
Statement B: This is incorrect because you cannot cancel the work order after performing transactions.
Statement E: This statement is irrelevant in the context of executing rework work orders with manual control.
NEW QUESTION # 26
You have been asked to set up cost estimates for 10 different purchased items. Which two tasks can you perform to achieve this?
- A. Run the "Update Item Cost Estimate" ESS process.
- B. Call a web service.
- C. Import a spreadsheet.
- D. Enter cost estimates directly into the UI.
- E. Use the Mass Edit functionality.
Answer: C,D
Explanation:
To set up cost estimates for multiple purchased items in Oracle Manufacturing Cloud, the following tasks can be performed:
Import a spreadsheet (A): You can import cost estimates for multiple items at once using a preformatted spreadsheet, which allows for efficient data entry.
Enter cost estimates directly into the UI (E): Cost estimates can also be manually entered directly through the user interface for individual items, providing flexibility when fewer items need to be updated.
Incorrect options:
Calling a web service (B) is not the correct method for setting up cost estimates.
Mass Edit functionality (C) and Update Item Cost Estimate process (D) do not directly apply to entering new cost estimates for purchased items.
NEW QUESTION # 27
In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?
- A. Supply Chain Orchestration initiates the creation of a requisition with the project details.
- B. Expenditure Item Date Is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant.
- C. Supply Chain Orchestration initiates the creation of a purchase order without the work order.
- D. Expenditure Item Date is set to the receipt date and Expenditure Organization is set to the manufacturing plant.
- E. Expenditure Type is sat to the expenditure type associated to the outside processing Item.
Answer: A,B,E
Explanation:
Supply Chain Orchestration (SCO) plays a vital role in managing project-specific work orders, particularly for outside processing. Here's how it enriches supply requests with project details:
Statement B: Expenditure Item Date is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant - In project-specific work orders, Supply Chain Orchestration assigns the need-by date as the Expenditure Item Date. The Expenditure Organization is typically set to the manufacturing plant handling the work order.
Reference:
Statement D: Supply Chain Orchestration initiates the creation of a requisition with the project details - SCO automatically creates a requisition with all relevant project details, such as project number, task, and expenditure information. This ensures that the procurement process is aligned with the project's financial and material requirements.
Statement E: Expenditure Type is set to the expenditure type associated with the outside processing item - In Oracle Cloud, expenditure types must align with the specific processing items. SCO ensures that the correct expenditure type is applied to the work order and subsequent requisitions.
Incorrect Statements:
Statement A: SCO does not initiate the creation of a purchase order without the work order. A work order is essential for processing the outside work, and its absence would disrupt the orchestration process.
Statement C: The Expenditure Item Date is not set to the receipt date but rather to the requested need-by date for proper alignment with project scheduling.
NEW QUESTION # 28
A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particular day.
Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?
- A. Click Inside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource dropdown list > Enter 4 in Default Units Available.
- B. Click inside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration Fields > Go to the Resource Availability region > Populate A units in the Default Availability column.
- C. Click outside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration fields > Go to the Resource Availability and Overrides region > Populate 4 units in the Availability Override column.
- D. Click outside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource drop-
Answer: C
Explanation:
In Oracle Manufacturing Cloud, to make a resource (R1) available outside the regular shift for a specific day, you need to create a resource exception. This allows you to override the default shift schedule and make additional units of the resource available.
Click outside the existing shift time ensures that the exception applies to non-working hours.
Select Create Resource Exception from the Actions menu to initiate the exception.
Populate the Start and Duration fields to define the non-working period during which the resource will be available.
Enter 4 units in the Availability Override column to ensure that 4 units of resource R1 are made available for use during the exception period.
NEW QUESTION # 29
Which statement is NOT true about cumulative lead time?
- A. It updates lead time percent at the operation level in the work definition.
- B. It calculates cumulative manufacturing lead times by rolling up manufacturing lead times of make Items.
- C. It updates the item's lead time attributes at the end of the calculation process: cumulative manufacturing and cumulative total lead times.
- D. It calculates cumulative total lead times by rolling up lead times of make items and adding up lead time values of buy items.
Answer: A
NEW QUESTION # 30
Two work definitions are created in the application: one for Engine Finished Good and the other for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Good as one of its components.
How can you establish the relationship between the Pallet and Engine work definitions?
- A. Work definition versions can be used to tie the work orders.
- B. The two work definitions can be tied through Project or Selban numbers.
- C. Create a subinventory to serve as the completion subinventory for yielding Pallet, and then use the same subinventory to serve as the supply subinventory of Pallet in the work definition created for Engine.
- D. Assign a higher priority to the work definition created for Engine and a lower one to the work definition for Pallet.
Answer: C
Explanation:
To establish a relationship between the work definitions of Engine Finished Good and Pallet Finished Good, you can create a common subinventory. This subinventory will serve as the completion subinventory for the Pallet Finished Good and the supply subinventory for the Engine Finished Good. This ensures that the Pallet Finished Good is completed in one process and is then available as a component for the Engine Finished Good.
Subinventory Linking: Using a common subinventory ties the output from one work definition as an input to another. The Pallet becomes an inventory item that is consumed in the production of the Engine.
NEW QUESTION # 31
Which option represents all the production exception types that can be reported by a Production Operator in Oracle Manufacturing Cloud?
- A. Work Area, Work Center, and Resources
- B. Resources and Components
- C. Work Area. Work Center. Resources, Components, and Miscellaneous
- D. Work Area, Work Center, Resources, and Components
- E. Work Center and Resources
Answer: D
Explanation:
In Oracle Manufacturing Cloud, production operators can report several types of production exceptions that affect the flow of the production process. The complete list of production exception types that can be reported includes:
Work Area: Issues related to the broader production environment.
Work Center: Problems or exceptions that arise at specific work centers.
Resources: Issues with labor, machines, or tools that are part of the production process.
Components: Exceptions related to materials or components used in manufacturing.
Incorrect options:
Options A, B, C, D are incomplete and miss one or more of the exception types available in Oracle Manufacturing Cloud.
NEW QUESTION # 32
In a Manufacturing Cloud implementation, users are finding it difficult to track information about work orders executed across various work centers.
Which three information types in the Work Order Traveler can help users in this situation?
- A. Reservation against sales orders
- B. Product serial Information
- C. Hard pegging of items
- D. Work definition details
- E. Item on-hand quantity
Answer: A,B,D
Explanation:
The Work Order Traveler in Oracle Manufacturing Cloud provides detailed information about work orders to help users track and manage work orders across various work centers. The following types of information are especially useful:
Work definition details (D): This provides detailed information about the operations and resources required to complete the work order, helping users understand the manufacturing process and requirements.
Product serial information (E): Tracking serial numbers for products is critical, especially in industries where traceability and product lifecycle management are important.
Reservation against sales orders (A): This information links work orders to specific sales orders, providing clarity on how the work order aligns with customer demand.
Incorrect options:
Hard pegging of items (B) and Item on-hand quantity (C) are not typically tracked through the Work Order Traveler report, as this report focuses more on the work order's execution rather than inventory management.
NEW QUESTION # 33
To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.
Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?
- A. Attachments at any level
- B. Work definition header and version attributes
- C. Item structure component attributes referenced from Product Information Management(PIM)
- D. Operation resources. Including alternate resources
- E. Descriptive flexfields (OFFs) at any level
Answer: C
Explanation:
When enabling audit trail functionality to ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), certain actions related to work definitions and standard operations are audited for changes such as creation, update, and deletion. However, not all aspects are tracked in the audit trail.
Item structure component attributes referenced from Product Information Management (PIM) are not included in the audit trail. PIM attributes are managed separately from manufacturing-specific data, and changes to these components are not captured in the standard operations audit trail.
Audited components typically include:
Work definition header and version attributes
Descriptive flexfields (DFFs) at any level
Attachments at any level
Operation resources, including alternate resources
NEW QUESTION # 34
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.
Which seeded job role must you assign to this employee?
- A. Production Operator
- B. Manufacturing Engineer
- C. Production Supervisor
- D. Manufacturing Supervisor
- E. Production Engineer
Answer: B
Explanation:
In Oracle Manufacturing Cloud, the Manufacturing Engineer role is responsible for dealing with various manufacturing practices, processes, machines, tools, and equipment that transform raw materials into finished products. This role focuses on defining and managing production processes, resources, and operations in manufacturing plants.
Manufacturing Engineer: This role involves creating and maintaining manufacturing processes, production resources, and work instructions. It ensures that products are manufactured efficiently and in compliance with quality standards.
NEW QUESTION # 35
A Production Supervisor queries a work order, WO-1025, from the Manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, the supervisor finds a General Information, Operations, and History tab, but no Reservations tab.
What are two reasons for the Reservations tab not being displayed for WO-1025?
- A. It is not a Configured Item work order.
- B. It Is not a Drop-Ship work order.
- C. It is not a Plan-to-Produce work order.
- D. It is not a Pick-to-Order work order.
- E. It is not a Back-to-Back work order.
Answer: A,E
Explanation:
In Oracle Manufacturing Cloud, the Reservations tab on the Edit Work Order page is displayed only for specific types of work orders that require reservations of components or materials. The absence of the Reservations tab in work order WO-1025 indicates that the work order is not one of the following types:
Configured Item Work Order (A): Configured items are typically built based on specific customer requirements, and reservations of components are often necessary. Since WO-1025 is not a configured item work order, the Reservations tab is not shown.
Back-to-Back Work Order (E): Back-to-back work orders are linked to sales orders and require reservations of materials to fulfill the specific demand. Since WO-1025 is not a back-to-back work order, the tab is not displayed.
Incorrect options:
B, C, D: Drop-Ship, Pick-to-Order, and Plan-to-Produce work orders do not typically require reservations in the same way as configured or back-to-back orders, which is why they are not the reasons for the absence of the Reservations tab.
NEW QUESTION # 36
In the work execution area, which three infolets are provided to users for instant access?
- A. work order Exception
- B. Operation Efficiency
- C. Scrap
- D. Operation Exception
- E. Work Order Performance
Answer: A,D,E
Explanation:
In the Work Execution area of Oracle Manufacturing Cloud, several infolets provide users with quick access to critical data. The following infolets are available for immediate access:
Work Order Performance: Provides an overview of the performance of work orders against the planned schedule, showing progress and efficiency.
Operation Exception: Highlights any exceptions or issues encountered during operations, enabling quick identification of problems.
Work Order Exception: Displays any issues or exceptions related to work orders, such as delays or material shortages.
Incorrect options:
Scrap and Operation Efficiency are important metrics, but they are not available as standard infolets in the Work Execution area.
NEW QUESTION # 37
You are defining a standard operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Which setup task must you perform to achieve this?
- A. Select the Count Point check box while defining the standard operation.
- B. Ensure that the Charge Type of the resource is Automatic.
- C. Deselect the Count Point check box while defining the standard operation.
- D. Select the Automatically Transact check box while defining the standard operation.
Answer: A
Explanation:
In Oracle Manufacturing Cloud, when defining a standard operation such as visual inspection, marking it as a Count Point ensures that its completion will be tracked and reported for all work orders referencing it. A Count Point operation is one where progress must be explicitly recorded, allowing visibility into work order completion.
Selecting the Count Point check box ensures that this operation becomes a mandatory checkpoint where users must report completion in all related work orders. This is essential for operations like visual inspection, where reporting completion is critical to production quality.
NEW QUESTION # 38
Your client needs to implement operational checks for compliance with training and job requirements. Which four statements are true about this functionality?
- A. You have the ability to associate a Job profile with a Standard operation resource.
- B. A qualified operator need not be specified to report resource transactions.
- C. You have the ability to associate a Job profile with a Work definition operation resource.
- D. You do not have the ability to associate a Job profile with a Work order operation resource.
- E. The qualification Is used to warn a production supervisor If they assign operators that don't meet the skill requirements against the resource.
- F. The qualification Is enforced during reporting of labor usage.
Answer: A,C,E,F
Explanation:
Oracle Manufacturing Cloud provides functionality to enforce compliance with training and job requirements through operational checks. The correct statements are:
Statement B: You can associate a job profile with a work definition operation resource. This ensures that only operators who meet the job requirements are allowed to perform the work.
Statement C: Qualifications are enforced when reporting labor usage, meaning that if an operator lacks the required qualifications, the system can prevent or warn about the labor transaction.
Statement D: You can also associate a job profile with a standard operation resource to enforce skills and training compliance.
Statement F: If an unqualified operator is assigned to a task, the system can notify the production supervisor to avoid non-compliance with skill requirements.
Incorrect options:
Statement A: A qualified operator must be specified to report resource transactions.
Statement E: You can associate a job profile with a work order operation resource, contrary to what is implied.
NEW QUESTION # 39
During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.
What must they do to achieve this?
- A. Exclude cost variances while closing last month's work orders because those can be applied directly In Subledger Accounting.
- B. Update work order costs at any time; they can be updated regardless of the status of the work order
- C. Include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected must not be closed.
- D. Make sure that all costs are Included while closing last month's work orders; however, variances can be Included after closing the work orders.
Answer: C
Explanation:
To ensure that work orders for the previous month are closed with the correct costs, the Production Supervisor must:
Include all costs and variances in the work orders before closing them. This ensures that the work orders reflect the true cost of production, including any deviations from the expected costs. However, if there are work orders that are still in progress or expected to receive updates (such as material or labor transactions), those work orders should not be closed until all costs are finalized.
Incorrect options:
A: Excluding cost variances would result in inaccurate costing.
B: All costs, including variances, must be included before closing.
D: Costs cannot be updated after the work order is closed, so all updates must occur before closing the work order.
NEW QUESTION # 40
You are implementing project-driven supply chain functionality. You need to set up movement requests to issue or transfer project material to manage the inventory associated with projects and tasks.
Which two are types of movement requests to issue or transfer project material?
- A. Create o movement receipt line with the Project Costing widget.
- B. Pick transactions Interfaced by the project costing project and task using the project material, common Inventory, or Inventory from another project.
- C. Perform manual pick for such movement requests using the project material, common inventory, or inventory from another project.
- D. Transfer project material from one subinventory to another.
Answer: C,D
Explanation:
When setting up movement requests in a project-driven supply chain, you need to manage inventory associated with specific projects and tasks. The two correct types of movement requests in this context are:
Statement A: Transfer project material from one subinventory to another - This is a standard type of movement request in Oracle Cloud, allowing project materials to be transferred between subinventories. It is essential for managing inventory tied to specific projects and tasks, ensuring that materials are available where needed for project execution.
Reference:
Statement D: Perform manual pick for such movement requests using the project material, common inventory, or inventory from another project - Manual picking for project-specific material is another supported operation. It allows users to perform manual picks from various sources, such as project material, common inventory, or even inventory from other projects.
Incorrect Statements:
Statement B: Pick transactions are not interfaced specifically by project costing. Although project costing is relevant for tracking costs, it is not the driving factor behind pick transactions.
Statement C: There is no concept of creating a movement receipt line with the "Project Costing widget" in Oracle Manufacturing Cloud.
NEW QUESTION # 41
A Manufacturing Engineer in a plant is creating an alternate manufacturing process for an item using its existing work definitions. After copying from the existing work definition, WD1, to the alternate work definition, WD2, the engineer finds that the operation items were not copied in the alternate manufacturing process WD2.
What is the reason for this?
- A. Production Priority was not populated in the new WD2 during creation.
- B. Start Date was not populated in the new WD2 during creation.
- C. Item and Structure Name in the existing WD1 were retained in the new WD2 during creation.
- D. Item and Structure Name were changed in the new WD2 during creation.
Answer: D
Explanation:
When creating an alternate work definition (WD2) by copying from an existing one (WD1), if the Item and Structure Name were changed during the creation of WD2, the operation items would not be copied. This is because operation items are tied to specific item structures. Changing the structure results in a disconnect between the original operation items and the new work definition.
Item and Structure Name are critical in ensuring that the operation items (components and materials) are transferred when copying work definitions. If these names are changed, the system does not assume the same items should be used.
NEW QUESTION # 42
Your customer has multiple distribution centers and a few manufacturing plants. The plants manufacture different items with some overlap between them. The distribution centers stock parts from all plants.
A Corporate Engineering team is responsible for centrally defining items and catalogs. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants must be allowed to change some attributes locally.
What is the best way to achieve this?
- A. Set up plants, distribution centers, and the Corporate Engineering organization as inventory organizations.
- B. Set up plants and distribution centers as inventory organizations, and the Corporate Engineering organization as an Item organization.
- C. Set up plants and the Corporate Engineering organization as item organizations, and distribution centers as inventory organizations.
- D. Set up plants and the Corporate Engineering organization as Inventory organizations, and distribution centers as item organizations.
- E. Set up plants as inventory organizations, and distribution centers and the corporate Engineering organization as item organizations.
Answer: B
Explanation:
In Oracle Cloud, managing items and their attributes across multiple organizations requires careful structuring of inventory and item organizations. The best way to configure this setup given the customer's requirements is as follows:
Plants and Distribution Centers as Inventory Organizations: Inventory organizations are required to manage on-hand quantities, perform transactions, and handle the physical movement of materials. Plants need to be inventory organizations to manage production, and distribution centers need to be inventory organizations to manage stocking and distribution.
Corporate Engineering Organization as an Item Organization: An item organization is responsible for centrally defining item attributes. By setting the Corporate Engineering team as an item organization, you ensure that item definitions are controlled centrally. The team can define standard attributes while allowing inventory organizations (plants and distribution centers) to modify certain attributes at their level based on local needs.
This structure allows for centralized item management with localized flexibility for plants and distribution centers.
Reference:
Incorrect Options:
A: Defining all entities as inventory organizations would not allow centralized control of item attributes.
C, D, E: These setups would either limit the ability to control item attributes centrally or misassign organizations that need to handle physical inventory as item-only organizations.
NEW QUESTION # 43
Your client's company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.
You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.
Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?
- A. Using a deferred approval process with notifications, the work order is held in "Released" status until the approvals are obtained.
- B. These capabilities are supported for discrete and process work orders.
- C. It generates e-records on initial work order release through UI and sends notifications to approvers.
- D. If the e-record is rejected, you can optionally resubmit the rejected electronic records.
Answer: A
Explanation:
When implementing Oracle E-Signatures and E-Records for compliance with 21 CFR Part 11 in regulated industries like the pharmaceutical or food industries, certain processes govern how electronic records and signatures are managed for manufacturing work orders. The statement that is not true is:
Statement B is incorrect because when using deferred electronic records and signatures, the work order is not held in a "Released" status until approvals are obtained. Instead, the work order is placed in a "Pending Approval" state until signatures are collected and approval is granted. Only after approval does the work order move to a "Released" status.
Correct statements:
Statement A: E-records are generated at the time of work order release, and notifications are sent to approvers for review.
Statement C: Rejected e-records can be resubmitted for approval if necessary.
Statement D: These capabilities are supported for both discrete and process manufacturing work orders.
NEW QUESTION # 44
Which is NOT a required setup task for Manufacturing master data?
- A. Manage Work Centers
- B. Manage Work Areas
- C. Manage Plant Parameters
- D. Manage Production Resources
- E. Manage Plant Profiles
Answer: E
Explanation:
In Oracle Manufacturing Cloud, setting up the Manufacturing master data involves a series of required tasks to enable production operations. The following are the key setups:
Manage Production Resources: This setup task is essential for defining resources such as labor, equipment, and tools that are used in the manufacturing process. Resources are vital to the production planning and scheduling functions.
Manage Plant Parameters: This task is required to define how the plant will operate in terms of material handling, scheduling, costing, and other key operational metrics. These parameters control important aspects of how manufacturing will function at the plant level.
Manage Work Centers: Work centers represent the physical or logical locations where manufacturing operations occur. They must be set up for scheduling and executing production activities.
Manage Work Areas: Work areas are required to group related work centers and define operational zones within a plant. This is important for organizing production and ensuring efficient material flow.
Manage Plant Profiles: This task is not required for setting up manufacturing master data. Plant profiles are typically used for broader plant-level settings but are not directly tied to the manufacturing execution setup.
NEW QUESTION # 45
......
1z0-1075-24 Dumps and Practice Test (52 Exam Questions): https://www.pass4training.com/1z0-1075-24-pass-exam-training.html
Guide (New 2025) Actual Oracle 1z0-1075-24 Exam Questions: https://drive.google.com/open?id=1cLvKgh_WMeSSLROQhdu8P0CN8hbWV_d4

