[Dec 02, 2021] Latest Nutanix NCSE-Core Exam Practice Test To Gain Brilliante Result [Q98-Q113]

Share

Latest [Dec 02, 2021] Nutanix NCSE-Core Exam Practice Test To Gain Brilliante Result

Take a Leap Forward in Your Career by Earning Nutanix NCSE-Core


Who should take the NUTANIX NCSE CORE exam

An ideal candidate for the NCAP 5.10 certification has approximately 1-2 years of experience working with AOS with at least 6 months of experience working with AHV, as well as additional generalized systems administration experience. They are typically IT professionals and IT architects who are capable of optimizing and troubleshooting both virtualized workloads and infrastructure components on an AOS 5.10 implementation and can use Prism Central to centrally monitor, manage and troubleshoot multi-cluster deployments. The following products are covered in this exam:

  • Prism Central (all license tiers)
  • Acropolis (all license tiers)

For more info visit:

NUTANIX NCSE CORE Exam Reference

 

NEW QUESTION 98
Which function does the Curator service perform?

  • A. Stores cluster configuration
  • B. Starts and stops other cluster services
  • C. Schedules snapshots
  • D. Distributes storage optimization tasks

Answer: D

 

NEW QUESTION 99
An SE is working with a financial institution prospect on a VDI environment refresh. The institution currently has 5000 named VDI users, with a peak of 2800 concurrent users.
How many VDI VMs does the SE need to size for, factoring in an additional 10% for growth?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 100
A customer previously purchased a Nutanix solution of nine NX-3060-G7 nodes. The customer asks for help to increase the resiliency of their environment after power outages to individual racks in their datacenter Their current solution consists of two NX-3460-G7 blocks and a single NX-3160-G7 block placed in a single rack. what should the systems engineer recommend to this customer ?

  • A. Move on node from each NX-3460 into the NX-3160 block. Spread the blocks over three racks and enable Rack Awareness
  • B. Buy three additional NX-3060 Upgrade nodes and place them into the NX-3160 block Enable Rack Awareness
  • C. Buy on additional node and place it, into the NX-3160 block. Spread the blocks over three racks. Enable Rack Awareness.
  • D. Move on node from each NX=3460 block over to the NX-3160 blocks. Enable Block Awareness

Answer: D

 

NEW QUESTION 101
A prospective customer wants to refresh their current on-premises infrastructure that. consists of 4 ESXi hosts.
each with 20 cores and 512GB of RAM, and 1.2PB of usable SAN storage They have recently renewed their ESXi licensing, and all data must remain within their physical network. They are concerned that a hyperconverged solution will not meet their storage requirements without requiring a significant increase in the number of required ESXi hosts and licenses. Which Nutanix capability should the systems engineer review with the customer?

  • A. Replace the hypervisor with AHV
  • B. Position storage-only nodes
  • C. Build Cluster on a public cloud
  • D. Use Volumes to provide storage

Answer: B

 

NEW QUESTION 102
When creating a multi-cluster scenario in Sizer, what does the Summary Failover Capacity indicator (N+0, N+1) display?

  • A. The indicator shows the worst resiliency level of any cluster in the scenario
  • B. N+0, if the CPU utilization for all clusters falls below N+1 resiliency.
  • C. The indicator shows the best resiliency level of any cluster in the scenario
  • D. N+0, if the RAM utilization for all cluster in the scenario.

Answer: C

 

NEW QUESTION 103
How will an HDD failure affect VMs with data on the failed device?

  • A. A live migration will be initiated, moving the affected VMs to a host that contains the replica data.
  • B. The VMs will remain operational on that host and continue to function normally with no noticeable impact
  • C. An HA event will occur, causing the affected VMs to restart on a node that contains the replica data.
  • D. The VMs will crash, and will be restarted once the failed HDD has been replaced and the data has been restored.

Answer: B

 

NEW QUESTION 104
A systems engineer is creating a configuration in Sizer for a customer that is building an app for use as an ebooks repository The app requires the following two workloads : 1. 50 generic web server VMs, each with 2 vCPUs on a 4:1 vCPU ratio, 8 GB of RAM, and 100GB of storage each 2. A fileserver workload with 80TB of usable storage available, which contains mostly PDF's and pre-compressed data Any reduction in performance of the web servers must be avoided. After entering the workload with default options, the Sizer outputs the configuration shown in the exhibit. Which adjustment does the systems engineer need to make to the scenario to meet the performance requirements ?

  • A. increase the vCPU:CPU ratio of the Webserver workload to 6:1
  • B. Switch to manual and change the CPUs of the node configuration to a dual 10 core model
  • C. Switch to manual sizing and increase the RAM of the node configuration to 384 GB
  • D. increase the RAM of the web server workload to 10 GB per VM.

Answer: D

 

NEW QUESTION 105
prospect uses Vmware, Oracle, and Microsoft products for a critical application. The prospect prefers an all flash array because they have significantly invested in servers for their Oracle environment to save on licensing costs.
which feature should be discussed to address this objection?

  • A. Hyper-V support
  • B. AHV
  • C. ABS
  • D. All flash nodes

Answer: C

 

NEW QUESTION 106
What are two key Nutanix value propositions? (Choose two)

  • A. Rapid time to value
  • B. One-Click Infrastructure Management
  • C. Highest performance across all workload types
  • D. Lowest initial cost than a comparable competitive HCI or 3-tier solution

Answer: B,D

 

NEW QUESTION 107
A customer needs to deploy 5000 virtual desktops on Nutanix. The requirements can for an active/active deployment, such that an entire site can be made unavailable due to maintenance or disaster without impacting desktop availability.
What is the minimum number of nodes necessary to meet the customer's requirements?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B

 

NEW QUESTION 108
Which function does the Curator service perform?

  • A. Start and stops other cluster services
  • B. Stores cluster configuration
  • C. Schedules snapshots
  • D. Distributes storage optimization tasks

Answer: D

 

NEW QUESTION 109
A prospective customer wants to migrate database workloads to Nutanix. They are currently running these workloads on a 3-tier vSphere architecture made up of 5 hosts connected to a hybrid SAN over 10G iSCSI.
The hosts each have 256G RAM and 2 Broadwell 2.8Ghz 12 core processors. The largest database VM is configured with 64G of memory. Some databases are fairly old and single threaded Current performance is deemed acceptable. Which configuration component is most important to maintain the customer experience on a new Nutanix cluster and minimize costs ?

  • A. Make sure the cluster uses 512G per host to protect NUMA boundaries.
  • B. Make sure the cluster uses 25G nics to speed up the network
  • C. Make sure the cluster is all flash to speed up data access.
  • D. Make sure the cluster uses similar speed processors regardless of generation

Answer: D

 

NEW QUESTION 110
Refer to Exhibit.

When entering a Raw Input workload into Sizer, what amount of RAM should be used for the entire workload?

  • A. 42GB
  • B. 32GB
  • C. 48GB
  • D. 64GB

Answer: B

 

NEW QUESTION 111
Refer to the exhibit.

Assuming a prospect is currently using Thick Provisioned virtual disk, at a minimum, which two tabs should be evaluated in an RVTools report to determine required resources for sizing? (Choose two.)

  • A. vDisk
  • B. vPartition
  • C. vCluster
  • D. vInfo
  • E. vNetwork

Answer: B,D

 

NEW QUESTION 112
Which two items are considered by Sizer when calculating the required cluster resources with only the Raw Input workload type for multi-VM workload? (Choose two)

  • A. Large VM NUMA requirements
  • B. The required RAM for the CVM
  • C. The vCPU:pCore ratio applied for specific VMs
  • D. The vCPU:pCore ratio applied to all VMs.

Answer: B,D

 

NEW QUESTION 113
......

Authentic Best resources for NCSE-Core Online Practice Exam: https://www.pass4training.com/NCSE-Core-pass-exam-training.html

Updates Up to 365 days On Developing NCSE-Core Braindumps: https://drive.google.com/open?id=1fOn3142_0ayJqpVqM7yo6oAxhuBdfX2c