Guaranteed Success in SAP Certified Application Associate C_TS422_2020 Exam Dumps [Q45-Q63]

Share

Guaranteed Success in SAP Certified Application Associate C_TS422_2020 Exam Dumps

SAP C_TS422_2020 Daily Practice Exam  New 2021 Updated 82 Questions


SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:

Passing ScoreC_TS422_2020 - 56%
C_TS422_1909 - 55%
Duration180 mins
Number of Questions80
Schedule ExamSAP Training
Sample QuestionsSAP S/4HANA Production Planning and Manufacturing Certification Sample Questions
Exam NameSAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
Reference BooksTS421, TS422 (SAP S/4HANA 2020)
TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909)
LevelAssociate
Exam CodeC_TS422_2020
Exam Price$550 (USD)

 

NEW QUESTION 45
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

  • A. Plant
  • B. Material
  • C. Work center
  • D. Production version

Answer: B,C

 

NEW QUESTION 46
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To increase the number of planning levels
  • B. To make the assignment of components easier
  • C. To reduce the number of material masters
  • D. Tosimplify the structure of bills of material
  • E. To reduce the number of changes required in bills of material

Answer: B,D,E

 

NEW QUESTION 47
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Checking rule and group must be assigned.
  • C. Indicator Relevant for finite scheduling must be set.
  • D. PRT Availability check must be set.

Answer: A,C

 

NEW QUESTION 48
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Scheduling control (finite/infinite)
  • B. Finiteness level (0...1)
  • C. Planning mode (bucket/sequence)
  • D. Fixed pegging (on/off)
  • E. Direction (forward/backward)

Answer: A,C,E

 

NEW QUESTION 49
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a reservation.
  • B. It is converted into a schedule line.
  • C. It is converted into a planned order.
  • D. It is converted into a production order.

Answer: A

 

NEW QUESTION 50
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
  • D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.

Answer: A

 

NEW QUESTION 51
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Pick/pack time
  • B. Queue time
  • C. Move time
  • D. Float before production
  • E. Wait time

Answer: A,B,E

 

NEW QUESTION 52
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When you deliver a sales order
  • B. When you create a sales order
  • C. When the MRP results are saved
  • D. When you create a planned order

Answer: B

 

NEW QUESTION 53
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. In-house production time
  • B. Planned delivery time
  • C. Operation duration
  • D. Total replenishment lead time

Answer: A,B

 

NEW QUESTION 54
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with prioritized alternative work centers
  • B. A production line with more than one work center
  • C. A production line with a parallel sequence in the routing
  • D. A production line with an alternative sequence in the routing

Answer: B

 

NEW QUESTION 55
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the operation using lead the scheduling.
  • B. You can reschedule the operation using finite Scheduling in a planning board.
  • C. You canreschedule the order using material requirements planning.
  • D. You can reschedule the order using lead time scheduling.

Answer: B

 

NEW QUESTION 56
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By material type
  • B. By industry
  • C. By plant
  • D. By period

Answer: C,D

 

NEW QUESTION 57
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Select an alternative mode on a resource.
  • C. Form optimum sequences to reduce setup times.
  • D. Execute a new production planning run.
  • E. Reduce the planning window.

Answer: A,B,C

 

NEW QUESTION 58
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Cost-related
  • B. Order-related
  • C. Milestone-related
  • D. Product-related

Answer: B,D

 

NEW QUESTION 59
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • B. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
  • C. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • D. The new operation is inserted at the desired time the previously dispatched operation is moved backward.

Answer: D

 

NEW QUESTION 60
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.

  • A. Full conversion
  • B. Partial conversion
  • C. Individualconversion
  • D. Order release

Answer: A,B

 

NEW QUESTION 61
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.

  • A. Use a specific MRP controller.
  • B. Use a specific MRP type.
  • C. Use a specific material group
  • D. Use a specific material status.

Answer: A,B

 

NEW QUESTION 62
What is the purpose of collective orders?

  • A. To combine order management of co-products and by-products with the main product
  • B. To manage production orders for an entirefinished product on multiple levels
  • C. To post any component withdrawals single back flush with order confirmation
  • D. To post production costs ona cost collector instead of the production order

Answer: B

 

NEW QUESTION 63
......


SAP C_TS422_2020 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.


 

Test Engine to Practice C_TS422_2020 Test Questions: https://www.pass4training.com/C_TS422_2020-pass-exam-training.html