Guaranteed Success in SAP Certified Application Associate C_TS422_2020 Exam Dumps
SAP C_TS422_2020 Daily Practice Exam New 2021 Updated 82 Questions
SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:
| Passing Score | C_TS422_2020 - 56% C_TS422_1909 - 55% |
| Duration | 180 mins |
| Number of Questions | 80 |
| Schedule Exam | SAP Training |
| Sample Questions | SAP S/4HANA Production Planning and Manufacturing Certification Sample Questions |
| Exam Name | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing |
| Reference Books | TS421, TS422 (SAP S/4HANA 2020) TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909) |
| Level | Associate |
| Exam Code | C_TS422_2020 |
| Exam Price | $550 (USD) |
NEW QUESTION 45
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Plant
- B. Material
- C. Work center
- D. Production version
Answer: B,C
NEW QUESTION 46
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To increase the number of planning levels
- B. To make the assignment of components easier
- C. To reduce the number of material masters
- D. Tosimplify the structure of bills of material
- E. To reduce the number of changes required in bills of material
Answer: B,D,E
NEW QUESTION 47
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Checking rule and group must be assigned.
- C. Indicator Relevant for finite scheduling must be set.
- D. PRT Availability check must be set.
Answer: A,C
NEW QUESTION 48
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control (finite/infinite)
- B. Finiteness level (0...1)
- C. Planning mode (bucket/sequence)
- D. Fixed pegging (on/off)
- E. Direction (forward/backward)
Answer: A,C,E
NEW QUESTION 49
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a reservation.
- B. It is converted into a schedule line.
- C. It is converted into a planned order.
- D. It is converted into a production order.
Answer: A
NEW QUESTION 50
How would you define pegging in the context of Advanced Planning?
- A. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- C. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
- D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
Answer: A
NEW QUESTION 51
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Pick/pack time
- B. Queue time
- C. Move time
- D. Float before production
- E. Wait time
Answer: A,B,E
NEW QUESTION 52
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
- A. When you deliver a sales order
- B. When you create a sales order
- C. When the MRP results are saved
- D. When you create a planned order
Answer: B
NEW QUESTION 53
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.
- A. In-house production time
- B. Planned delivery time
- C. Operation duration
- D. Total replenishment lead time
Answer: A,B
NEW QUESTION 54
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with prioritized alternative work centers
- B. A production line with more than one work center
- C. A production line with a parallel sequence in the routing
- D. A production line with an alternative sequence in the routing
Answer: B
NEW QUESTION 55
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the operation using lead the scheduling.
- B. You can reschedule the operation using finite Scheduling in a planning board.
- C. You canreschedule the order using material requirements planning.
- D. You can reschedule the order using lead time scheduling.
Answer: B
NEW QUESTION 56
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By material type
- B. By industry
- C. By plant
- D. By period
Answer: C,D
NEW QUESTION 57
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Select an alternative mode on a resource.
- C. Form optimum sequences to reduce setup times.
- D. Execute a new production planning run.
- E. Reduce the planning window.
Answer: A,B,C
NEW QUESTION 58
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Cost-related
- B. Order-related
- C. Milestone-related
- D. Product-related
Answer: B,D
NEW QUESTION 59
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- B. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
- C. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
- D. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
Answer: D
NEW QUESTION 60
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Full conversion
- B. Partial conversion
- C. Individualconversion
- D. Order release
Answer: A,B
NEW QUESTION 61
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific MRP controller.
- B. Use a specific MRP type.
- C. Use a specific material group
- D. Use a specific material status.
Answer: A,B
NEW QUESTION 62
What is the purpose of collective orders?
- A. To combine order management of co-products and by-products with the main product
- B. To manage production orders for an entirefinished product on multiple levels
- C. To post any component withdrawals single back flush with order confirmation
- D. To post production costs ona cost collector instead of the production order
Answer: B
NEW QUESTION 63
......
SAP C_TS422_2020 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
Test Engine to Practice C_TS422_2020 Test Questions: https://www.pass4training.com/C_TS422_2020-pass-exam-training.html