
[Jan 16, 2024] New Updated C_S4CMA_2308 Exam Questions 2024
Updated Free SAP C_S4CMA_2308 Test Engine Questions with 162 Q&As
NEW QUESTION # 95
Where do you specify the retention time of temporary data in the SAP S/4HANA Migration Cockpit?
- A. In the staging tables
- B. In the migration object template
- C. In the migration project
- D. In the migration object
Answer: B
NEW QUESTION # 96
What determines the replenishment strategy of a component in the SAP Best Practices Scenario Manufacturing with Kanban Supply into Production (1E3)?
- A. Production Supply area
- B. Procurement type
- C. Control cycle
- D. MRP type
Answer: C
NEW QUESTION # 97
How can customers activate additional SAP Best Practices processes? (3 correct)
- A. Request activation in the Production system after it is upgraded tu the latest quarter's release
- B. Request activation in the Starter system through the SAP Cloud Platform during the Realize phase
- C. Request activation in the Starter system from the SAP Service Center during the Deploy phase
- D. Request activation in the Quality system from the SAP Service Center during the Run Phase
- E. Request activation in the Quality system after it is upgraded to the latest quarter's release
Answer: A,C,D
NEW QUESTION # 98
Which customizing activities are allowed through the guided configuration tools? (2 correct)
- A. Adaptation of fields within SAP Best Practices content
- B. Deletion of SAP Best Practices content
- C. Addition of new SAP Best Practices business processes
- D. Addition of new fields within SAP Best Practices content
Answer: A,D
NEW QUESTION # 99
An SAP Central Business Configuration, what does the "Confirm Scope and Organizational Structure is Completed" milestone trigger in the Implementation Project?
- A. Installation of the Production System
- B. Installation of the Starter System
- C. Installation of the Quality System
- D. Initial Transport from Quality to Production
Answer: A
NEW QUESTION # 100
Which activities can you execute in the Maintain Business Roles SAP Fiori app? (2 correct)
- A. Assign business catalogs to a business role
- B. Assign authorization profiles to a business role
- C. Maintain general restrictions
- D. Maintain catalog roles
Answer: A,B
NEW QUESTION # 101
What is achieved with the integration between SAP Concur and Predictive Accounting?
- A. Automatic expense payment with upcoming payroll run
- B. Travel planning for the fiscal year based on historic data
- C. Real-time budget check when transferring travel requests
- D. Travel request budget check reporting for approver reviews
Answer: C
NEW QUESTION # 102
In the Quality Engineer Overview app, which types of inspection lots can you view? (2 correct)
- A. Inspection lots without an inspection lot number
- B. Inspection lots without a quality engineer assignment
- C. Inspection lots without a usage decision
- D. Inspection lots without an inspection plan
Answer: A,D
NEW QUESTION # 103
When can you define a custom ID or key for any organizational structure entity?
- A. After go-live
- B. During content activation
- C. After content activation
- D. Before initial content activation
Answer: C
NEW QUESTION # 104
In SAP Central Business Configuration, which activities can you perform in the Product-Specific Configuration Phase? Note: There are 3 correct answers to this question.
- A. Modify building blocks
- B. Add new sales organizations.
- C. Change approval thresholds
- D. Create new scope items.
- E. Add blocking reasons for billing.
Answer: B,C,D
NEW QUESTION # 105
You reviewed the project scope and identified the corresponding resources. Based on the SAP Activate methodology, which activities must you perform in the Explore phase? (2 correct)
- A. Conduct the Fit-to-Standard workshops to identify fits, gaps, and perceived gaps
- B. Configure the organizational structure and chart of accounts in the system
- C. Use the Starter system to demonstrate SAP Best Practices processes
- D. Use the Quality system to demonstrate SAP Best Practices processes
Answer: C,D
NEW QUESTION # 106
Which of the following changes would prevent SAP from running automated business Process tests on your behalf? Note: There are 2 correct answers to this question.
- A. Configuration changes that impact the process flow
- B. Changes to the data input requirements (custom data fields)
- C. Changes to the SAP S/4HANA Cloud release (upgrade)
- D. SAP-made changes to the standard test process
Answer: A,D
NEW QUESTION # 107
What are customers able to scope in SAP S/4 HANA Cloud with Central Business Configuration (CBC)? (3 correct)
- A. Countries where business processes will run
- B. Scope extensions
- C. Non-standard scenarios
- D. Public sector processes
- E. Pre-defined scenario bundles
Answer: A,C,E
NEW QUESTION # 108
Which SAP Fiori app is associated with the SAP Fiori Analytical Apps for Production Planning (2JD) scope item?
- A. Display MRP Key Figures
- B. Monitor Stock/Requirements List
- C. Overview Plant Management
- D. Planner Overview
Answer: C
NEW QUESTION # 109
What test process types are available in the Manage Your Test Processes app? Note There are 3 correct answers to this question
- A. Standard
- B. Custom
- C. Post-upgrade
- D. Regression
- E. Integration
Answer: A,B,C
NEW QUESTION # 110
You have created an event-driven Kanban in the SAP Best Practices Scenario Manufacturing with Kanban Supply into Production (1E3). Which process step is next?
- A. Print Kanban Card
- B. Backflush in Repetitive Manufacturing
- C. Set Kanban to Empty
- D. Set Kanban to Full
Answer: D
NEW QUESTION # 111
Which of the following business roles are relevant for the Make-to-Stock Production with Variant Configuration (21D) scope item? (3 correct)
- A. Billing Clerk
- B. Internal Sales Representative
- C. Configuration Expert - Business Process Configuration
- D. Cost Accountant - Production
- E. Production Planner
Answer: B,C,E
NEW QUESTION # 112
How can you process the defect in the Nonconformance Management (2QN) scope item? (3 correct)
- A. Change the status from In Process to Completed
- B. Change the status from Not Relevant to In Process
- C. Change the status from In Process to Not Relevant
- D. Change the status from Created to Completed
- E. Change the editing status Draft of the defect
Answer: A,C,D
NEW QUESTION # 113
You are taking part in a validation workshop for a scope item, and you identify a gap in a reporting requirement. What do you do?
- A. Write the extension specifications
- B. Create the change request
- C. Document the gap in detail
- D. Propose possible solution
Answer: C
NEW QUESTION # 114
Which Quality Management object is the production part approval process (PPAP) on SAP Cloud Platform integrated in with release S/4HANA Cloud 2008?
- A. Inspection log
- B. Quality info record
- C. Master inspection characteristics
- D. Process quality notifications
- E. Quality certificate
Answer: B
NEW QUESTION # 115
What SAP Fiorf app can you use in the SAP Best Practices Scenario Rework Processing - Stock Manufactured Material (BJN)?
- A. Manage Production Operations
- B. Manage Supplier Invoices
- C. Manage Purchase Requisitions
- D. Manage PIRs
Answer: A
NEW QUESTION # 116
......
Try 100% Updated C_S4CMA_2308 Exam Questions [2024]: https://www.pass4training.com/C_S4CMA_2308-pass-exam-training.html
The Best SAP Certified Application Associate C_S4CMA_2308 Professional Exam Questions: https://drive.google.com/open?id=1_LL_CN32gytV8wgO7JReQIF6Hppm0UNH

