NEW QUESTION # 83
What is the difference between a raised floor and a solid floor?

  • A. Raised floor is cheaper and easier to install
  • B. Solid floor allows for better cooling efficiency and higher load capacity
  • C. Solid floor is more flexible and adaptable to changing needs
  • D. Raised floor allows for better airflow and cable management

Answer: D


NEW QUESTION # 84
What are the 3 types of Authentication for access control?

  • A. Type 5 - What you desire
  • B. Type 6 - What you create
  • C. Type 4 - What you possess
  • D. Type 1 - What you have
    Type 2 - What you know
    Type 3 - What you are

Answer: D


NEW QUESTION # 85
what is another main function of the entrance room?

  • A. to store backup telecommunication devices
  • B. to house the telecommunications main grounding busbar
  • C. None of these
  • D. as a dedicated location outside building

Answer: B

Explanation:
Explanation:


NEW QUESTION # 86
Where should all Storage and Unpacking activities occur?

  • A. Outside Computer room, either in Storage Rooms or Staging Areas located adjacent to Computer Room with Dedicated air Handling
  • B. Near the Main Entrance of Data Center
  • C. Outside the Building, at a secure location.
  • D. None of these
  • E. Inside Computer Room

Answer: A


NEW QUESTION # 87
What is the minimum sized conductor from the rebar mat foundation to the mesh bonding network?

  • A. 4 AWG
  • B. 2 AWG
  • C. 6 AWG
  • D. 8 AWG

Answer: A


NEW QUESTION # 88
What is the formula for reliability?

  • A. R = e^-T
  • B. R = log(T)
  • C. R = T/e
  • D. R = e^T

Answer: A


NEW QUESTION # 89
Which areas should generate a history of all access attempts and monitored by CCTV Security System?

  • A. Only computer rooms
  • B. Loading Docks
  • C. Any concealed places
  • D. Storage Areas
  • E. Computer rooms, Loading docks, storage areas, Staging areas and Vendor Storage

Answer: E


NEW QUESTION # 90
What is the high temperature that must be maintained in a data center according to TIA-942?

  • A. 70 degrees
  • B. 85 degrees
  • C. 75 degrees
  • D. 80 degrees
  • E. 77 degrees

Answer: E


NEW QUESTION # 91
What is the recommended amount of fuel supply to be available to a class F0 data center?

  • A. None - No requirements
  • B. 48 hours
  • C. 12 hours
  • D. 24 hours

Answer: A


NEW QUESTION # 92
What is the clearance required between the cold aisle and the CRAC unit?

  • A. 6 feet
  • B. 4 feet
  • C. 8 feet
  • D. 2 feet

Answer: C


NEW QUESTION # 93
What is the acceptable dew point level in a data center according to TIA-942?

  • A. 75 degrees
  • B. 65 degrees
  • C. 80 degrees
  • D. 69.8 degrees
  • E. 60 degrees

Answer: D


NEW QUESTION # 94
What is the first preference regarding utility service, class F4?

  • A. At least two circuits from one substation, same path
  • B. One circuit from one substation, separate paths
  • C. At least two circuits from two separate substations, diverse substation power grids and separate paths
  • D. At least one circuit from two separate substations, different voltage levels

Answer: C


NEW QUESTION # 95
Where is temperature typically measured in a data center HVAC system?

  • A. At the server rack inlet
  • B. At the CRAC unit inlet
  • C. At the CRAC unit exhaust
  • D. At the server rack exhaust

Answer: B


NEW QUESTION # 96
What is the minimum slab floor to ceiling height recommended?

  • A. 14feetminimum
  • B. 16feetminimum
  • C. 15feetminimmum
  • D. 12feetminimum

Answer: C


NEW QUESTION # 97
What is the United States Average Power Utility Outage Annually And What Is The Average Repair Time?

  • A. 1.86 outages annually, with average repair time of four hours
  • B. 1 outage annually, with average repair time of approximately eight hours
  • C. Three outages annually, with an unknown average repair time
  • D. 2.5 outages annually, with average repair time of approximately 7 hours

Answer: A


NEW QUESTION # 98
What level should the battery room be on?

  • A. Grade Level
  • B. None
  • C. Upper floor
  • D. All
  • E. Lower Floor

Answer: A


NEW QUESTION # 99
What is the Fourth Preference Regarding Utility Service?

  • A. At least four circuits each from different distribution stations but fed via common feeders
  • B. Two balanced feeds with different voltages derived from a single distribution station
  • C. One circuit from one substation, separate paths
  • D. At least two circuits from one substation fed via alternative power grid

Answer: C


NEW QUESTION # 100
what is the ASHRAE recommended operational temperature.

  • A. Minimum <=50 degree[A]
    Maximum =>200Degrees[B]
  • B. Minimum =54 degrees[F]/12 degrees[C]
    Maximum=88 degrees [F]/31degrees[C]
  • C. Maximum <=33 Degree[XEIYCPJZDKLTWGBNMFUAHSRQV][/33][64]=''>
    Minimum >=18Degree[KOVBYPZXWMFGUTANLHQSRDCJE]</18>
  • D. Minimum =64 degrees[F]/18 degrees[C]
    Maximum=80 .6degrees [26 .9]<30 del=''> [C]

Answer: D


NEW QUESTION # 101
what is the ANSI/TIA-942 recommended operational temperature

  • A. -10°C to +45°C
  • B. 80F to 90F
  • C. 68F to 77F
  • D. 60F to 75F

Answer: C


NEW QUESTION # 102
What should be done with unused rack space?

  • A. it should be filled with blanking devices to reduce non-functional airflow
  • B. it should be used for additional storage purposes
  • C. they should be turned off to save energy costs
  • D. it should be left open to allow for better ventilation

Answer: A


NEW QUESTION # 103
What is the highest allowable elevation for a data center site?

  • A. 7,500 ft
  • B. 10,000 ft
  • C. 5,000 ft
  • D. 12,500 ft
  • E. 2,500 ft

Answer: B


NEW QUESTION # 104
What is the recommendation regarding row length?

  • A. Do not exceed 20 racks in length and dead-end rows not to exceed ten racks long
  • B. None
  • C. Maximum twenty-five racks in each row only
  • D. All
  • E. Ten Racks in Length

Answer: A

Explanation:
Explanation:


NEW QUESTION # 105
What are main concepts in choosing location of the entrance room?

  • A. All of these
  • B. Dedicated location outside building
  • C. If possible, it should be very close, and, in the computer room distance limitations for T1,T3,E1,and E3 circuits,
  • D. Should not be near to Data Center

Answer: C

Explanation:
Explanation:


NEW QUESTION # 106
Where is the recommended location for remote power panels?

  • A. outside the building
  • B. suspended from ceiling
  • C. at one or both ends of an equipment row
  • D. inside a sealed room

Answer: C


NEW QUESTION # 107
......